• Zinc Conc. TC 50%min CIF Chinaup(5)  10-14|Vanadium Pentoxide Powder 99.5%min EXW Chinadown(-3000)  10-14|Chrome Conc. Zimbabwean 48%min In port Chinadown(-1.8)  10-14|Cobalt Oxide 72%min Delivered Chinaup(7)  10-14|Cobalt Intermediate 30-40% CIF Chinaup(0.5)  10-14|Cobalt Chloride 24%min Delivered Chinaup(2500)  10-14|Lithium Cobaltate Co 60%min Delivered Chinaup(8)  10-14|Dysprosium Metal 99.5%min EXW Chinadown(-60)  10-14|Cobalt Metal 99.8%min Delivered Chinaup(10)  10-14|Cobalt Powder 99.5%min Delivered Chinaup(11)  10-14|Cobalt Sulfate 20.5%min Delivered Chinaup(2000)  10-14|Cobalt Tetroxide 73.5%min Delivered Chinaup(7)  10-14|Cobalt Metal 99.8%min In warehouse Rotterdamup(0.5)  10-14|LNCMO 8312 PC Delivered Chinaup(4)  10-14
  • 
    AsianMetal
    Events & Holidays
    event
    
    Business Visits

    Zibo Rundi Aluminum visits Asian Metal

    Zibo Rundi Aluminum Co., Ltd. visited Asian Metal on the afternoon of 25 July. Zhao Lei, CEO of Rundi Aluminum, revealed that their Kakande bauxite project in Guinea with designed capacity of 19 million tons works well and will come on stream in early 2019. Friday Gao, senior analyst of Asian Metal, discussed the current Chinese bauxite import market with him.
    Asian Metal
    From left: Tian Chunyu, general office manager of Rundi Aluminum; Gou Xiangyu, IT program manager assistant of Rundi Aluminum; Friday Gao, senior analyst of Asian Metal; Zhao Lei, vice general manager of Rundi Aluminum and Tian Lei, assistant of Zhao Lei
     
      Copyright © Asian Metal Ltd All rights reserved.