• Ferro-chrome Cr 60%min, C 0.1%max IW Rotterdamup(0.12)  07-24|Ferro-tungsten 75%min IW Rotterdamdown(-10)  07-24|Lanthanum Oxide 99.999%min EXW Chinaup(1200)  07-24|Rhenium APR 99.99%min EXW Chinadown(-700)  07-24|Met. Coke A 13%max, S 0.7%max EXW Shanxidown(-55)  07-24|Erbium Oxide 99.5%min EXW Chinaup(15)  07-24|Met. Coke A 13%max, S 0.7%max EXW Hebeidown(-55)  07-24|HR Coil SS400 3.0mm IW Hanoidown(-400000)  07-24|Met. Coke A 13%max, S 0.7%max EXW Shandongdown(-55)  07-24|Lanthanum Oxide 99.999%min FOB Chinaup(0.2)  07-24|Sodium Pyroantimonate 58.4% Delivered Chinadown(-1000)  07-24|Aluminum Alloy Ingot ADC12 Delivered Indiadown(-6000)  07-24|Sodium Tungstate WO3 68%min EXW Chinaup(10000)  07-24|Vanadium Pentoxide Flake 98%min IW Rotterdamdown(-0.1)  07-24
  • 
    AsianMetal
    Events & Holidays
    event
    
    Business Visits

    Axis Mineral visits Asian Metal

    On October 23, Axis Mineral Resources S.A. visited Asian Metal. Mr. Ramesh Sodum, Director of the Group, Mr. Nishant Thanki, Partner of the Group and its marketing agents, Mr. Alain Scheinin and Ms. Eileen Cheng introduced their bauxite project in Guinea. Meanwhile, they talked about current global bauxite market.
    Axis plans to launch the bauxite project in Guinea next October, with annual capacity of 5 million tonnes. They have independent road and port by themselves and the mine site is only around 40km away from the port.
    They will provide with bauxite Al 43-45% Si 2%max.
    Asian Metal
    From left: Friday Gao, Nishant, Romesh, Alain and Eileen
     
      Copyright © Asian Metal Ltd All rights reserved.