• Zinc Conc. TC 50%min CIF Chinaup(5)  10-14|Vanadium Pentoxide Powder 99.5%min EXW Chinadown(-3000)  10-14|Chrome Conc. Zimbabwean 48%min In port Chinadown(-1.8)  10-14|Cobalt Oxide 72%min Delivered Chinaup(7)  10-14|Cobalt Intermediate 30-40% CIF Chinaup(0.5)  10-14|Cobalt Chloride 24%min Delivered Chinaup(2500)  10-14|Lithium Cobaltate Co 60%min Delivered Chinaup(8)  10-14|Dysprosium Metal 99.5%min EXW Chinadown(-60)  10-14|Cobalt Metal 99.8%min Delivered Chinaup(10)  10-14|Cobalt Powder 99.5%min Delivered Chinaup(11)  10-14|Cobalt Sulfate 20.5%min Delivered Chinaup(2000)  10-14|Cobalt Tetroxide 73.5%min Delivered Chinaup(7)  10-14|Cobalt Metal 99.8%min In warehouse Rotterdamup(0.5)  10-14|LNCMO 8312 PC Delivered Chinaup(4)  10-14
  • 
    AsianMetal
    Events & Holidays
    event
    
    Business Visits

    Axis Mineral visits Asian Metal

    On October 23, Axis Mineral Resources S.A. visited Asian Metal. Mr. Ramesh Sodum, Director of the Group, Mr. Nishant Thanki, Partner of the Group and its marketing agents, Mr. Alain Scheinin and Ms. Eileen Cheng introduced their bauxite project in Guinea. Meanwhile, they talked about current global bauxite market.
    Axis plans to launch the bauxite project in Guinea next October, with annual capacity of 5 million tonnes. They have independent road and port by themselves and the mine site is only around 40km away from the port.
    They will provide with bauxite Al 43-45% Si 2%max.
    Asian Metal
    From left: Friday Gao, Nishant, Romesh, Alain and Eileen
     
      Copyright © Asian Metal Ltd All rights reserved.