• Antimony Trioxide 99.8%min FOB Chinaup(900)  04-03|Manganese Ore S.A. 36%min In Qinzhou Portdown(-1)  04-03|Manganese Ore S.A. 36%min In Tianjin Portdown(-1)  04-03|Manganese Ore S.A. 37%min In Qinzhou Portdown(-1)  04-03|Manganese Ore S.A. 37%min In Tianjin Portdown(-1)  04-03|Zinc Conc. 50%min EXW Chinadown(-500)  04-03|Chrome Conc. S.A. 40%min In port Chinaup(1.5)  04-03|Chrome Conc. Zimbabwean 48%min In port Chinaup(1.5)  04-03|Chrome Lump Turkish 40%min In port Chinaup(1.5)  04-03|Stainless HR Coil 201/No.1 6.0mm In warehouse Chinaup(200)  04-03|Lanthanum Oxide 99.999%min EXW Chinaup(400)  04-03|Chrome Conc. Turkish 46%min In port Chinaup(1.5)  04-03|Stainless CR Coil 201/2B 1.0mm In warehouse Chinaup(200)  04-03|Selenium Powder 99.9%min Delivered Chinaup(5)  04-03
  • Tsinghua (Binyang) Al-Cu new material project (phase one) commences construction

    2023-05-08 15:06:16   [Print]
    Recently, government of Binyang county, Nanning city held a construction commencement/completion ceremony for major projects of April.Asian Metal Copyright33 hectares and total investment of RMB2,400 million USD347 million, with its construction cycle from 2023 to 2026.Asian Metal Copyright During the month of April, there were 22 projects with a total investment of RMB5,116.Asian Metal Copyright18 million USD740 million going under construction or done with construction.Asian Metal Copyright18 million (USD740 million) going under construction or done with construction.Asian Metal Copyright Among them, Tsinghua Binyang Al-Cu new material project phase one, located in Litang Industrial Park, will be built with annual production capacities of 220,000t oxygen-free bare bright copper rod, 70,000t of precision alloy copper wire and 12 million pieces of PV-purpose aluminum products.Asian Metal Copyright Among them, Tsinghua (Binyang) Al-Cu new material project (phase one), located in Litang Industrial Park, will be built with annual production capacities of 220,000t oxygen-free bare bright copper rod, 70,000t of precision alloy copper wire and 12 million pieces of PV-purpose aluminum products.Asian Metal Copyright .Asian Metal Copyright The project will have a land area of 230 Mu (15.Asian Metal Copyright .Asian Metal Copyright33 hectares) and total investment of RMB2,400 million (USD347 million), with its construction cycle from 2023 to 2026.

    .Asian Metal CopyrightRecently, government of Binyang county, Nanning city held a construction commencementcompletion ceremony for major projects of AprilAsian Metal Copyright
    Aluminum Fluoride 61%min FOB China
    Unit:USD/mt
    Aluminum Fluoride 61%min FOB China USD/mt
    China bauxite producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.