• Lead Conc. TC 50%min CIF Chinadown(-30)  04-01|Ilmenite Conc TiO2 46%min Ex-VAT EXW Chinadown(-60)  04-01|Alumina 98.5%min FOB Australiadown(-10)  04-01|Cobalt Intermediate 30-40% CIF Chinaup(0.2)  04-01|Chrome Lump S.A. 38%min In port Chinaup(1)  04-01|Chrome Lump S.A. 38%min CIF Chinaup(5)  04-01|Chrome Lump 40%min FOB Turkeyup(5)  04-01|Chrome Lump Turkish 40%min CIF Chinaup(5)  04-01|Silicon Metal 5-5-3 Delivered Chinadown(-200)  04-01|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-300)  04-01|Chrome Conc. S.A. 40%min CIF Chinaup(5)  04-01|CR Coil SPCC 1.0mm FOB Chinaup(10)  04-01|Chrome Conc. S.A. 42%min CIF Chinaup(5)  04-01|Chrome Conc. S.A. 40%min In port Chinaup(1)  04-01
  • Guangxi Tiandong Jinxin puts 1.2Mtyp alumina project into operation

    2023-05-11 14:25:40   [Print]
    On April 26, Guangxi Tiandong Jinxin Chemical Co.Asian Metal CopyrightOn April 26, Guangxi Tiandong Jinxin Chemical Co.Asian Metal Copyright, Ltd.Asian Metal CopyrightOn April 26, Guangxi Tiandong Jinxin Chemical Co.Asian Metal Copyright officially put the 1.Asian Metal CopyrightOn April 26, Guangxi Tiandong Jinxin Chemical Co.Asian Metal Copyright2Mtyp alumina project into operation.Asian Metal Copyright The project has a single-line production capacity of 1.Asian Metal Copyright The project is located in Tiandong Petrochemical Industrial Park, Baise, Guangxi Zhuang Autonomous Region, with a construction area of 74,600 square meters and a total investment of 3.Asian Metal Copyright The project has a single-line production capacity of 1.Asian Metal Copyright18 billion yuan (459 million US dollars).

    The project has a single-line production capacity of 1.2 million tons of alumina, which reaches a large scale in China.Asian Metal Copyright18 billion yuan 459 million US dollars.Asian Metal Copyright The first and second stages are expected to produce 2.Asian Metal Copyright The project is located in Tiandong Petrochemical Industrial Park, Baise, Guangxi Zhuang Autonomous Region, with a construction area of 74,600 square meters and a total investment of 3.Asian Metal Copyright2 million tons of alumina a year, which is of great significance to the construction of Guangxi Baise ecological aluminum demonstration base and the promotion of the sustainable development strategy of Baise.

    .Asian Metal Copyright The project is located in Tiandong Petrochemical Industrial Park, Baise, Guangxi Zhuang Autonomous Region, with a construction area of 74,600 square meters and a total investment of 3Asian Metal Copyright
    Alumina 98.5%min FOB Australia
    Unit:USD/mt
    Alumina 98.5%min FOB Australia USD/mt
    China alumina producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.