• Spodumene Li2O 5%min In port Chinaup(25)  06-30|Spodumene Li2O 6%min CIF Chinaup(15)  06-30|Spodumene Li2O 3%min In port Chinaup(15)  06-30|Yttrium Oxide 99.999%min FOB Chinaup(0.2)  06-30|Chrome Conc. 40%min FOB S.A. down(-5)  06-30|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  06-30|Nickel Ore Philippine 1.3%min CIF Chinadown(-1)  06-30|Zircon Sand Zr(Hf)O2 65%min, Fe2O3 0.30%max EXW Chinadown(-200)  06-30|Nickel Ore Philippine 1.5%min CIF Chinadown(-1)  06-30|Nickel Ore Philippine 0.8%min CIF Chinadown(-0.5)  06-30|Tellurium Metal 99.99%min EXW Chinadown(-10)  06-30|Zirconium Oxychloride Zr(Hf)O2 36%min, Fe2O3 5-8ppm EXW Chinadown(-200)  06-30|Vanadium Pentoxide Flake 98%min EXW Chinadown(-1000)  06-30|Zirconium Oxychloride Zr(Hf)O2 36%min, Fe2O3 2ppm max EXW Chinadown(-200)  06-30
  • Guangxi Tiandong Jinxin puts 1.2Mtyp alumina project into operation

    2023-05-11 14:25:40   [Print]
    On April 26, Guangxi Tiandong Jinxin Chemical Co.Asian Metal Copyright The project is located in Tiandong Petrochemical Industrial Park, Baise, Guangxi Zhuang Autonomous Region, with a construction area of 74,600 square meters and a total investment of 3.Asian Metal Copyright, Ltd.Asian Metal Copyright The project has a single-line production capacity of 1.Asian Metal Copyright officially put the 1.Asian Metal Copyright, Ltd.Asian Metal Copyright2Mtyp alumina project into operation.Asian Metal Copyright18 billion yuan 459 million US dollars.Asian Metal Copyright The project is located in Tiandong Petrochemical Industrial Park, Baise, Guangxi Zhuang Autonomous Region, with a construction area of 74,600 square meters and a total investment of 3.Asian Metal Copyright2 million tons of alumina a year, which is of great significance to the construction of Guangxi Baise ecological aluminum demonstration base and the promotion of the sustainable development strategy of Baise.Asian Metal Copyright18 billion yuan (459 million US dollars).

    The project has a single-line production capacity of 1.2 million tons of alumina, which reaches a large scale in China.Asian Metal Copyright The project is located in Tiandong Petrochemical Industrial Park, Baise, Guangxi Zhuang Autonomous Region, with a construction area of 74,600 square meters and a total investment of 3.Asian Metal Copyright The first and second stages are expected to produce 2.Asian Metal Copyright2 million tons of alumina a year, which is of great significance to the construction of Guangxi Baise ecological aluminum demonstration base and the promotion of the sustainable development strategy of Baise.Asian Metal Copyright2 million tons of alumina a year, which is of great significance to the construction of Guangxi Baise ecological aluminum demonstration base and the promotion of the sustainable development strategy of Baise.

    .Asian Metal Copyright2 million tons of alumina a year, which is of great significance to the construction of Guangxi Baise ecological aluminum demonstration base and the promotion of the sustainable development strategy of BaiseAsian Metal Copyright
    Alumina 98.5%min FOB Australia
    Unit:USD/mt
    Alumina 98.5%min FOB Australia USD/mt
    China alumina producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.