• Antimony Conc. 50%min Delivered Chinaup(7000)  04-02|Silicon Metal 2-2-02 Delivered Chinadown(-500)  04-02|Antimony Trioxide 99.5%min FOB Chinaup(900)  04-02|Tin Conc. Burmese 20%min In warehouse MengAup(7000)  04-02|Tin Conc. Burmese 30%min In warehouse MengAup(7000)  04-02|Lanthanum Oxide 99.999%min EXW Chinaup(400)  04-02|Tin Conc. 60%min Delivered Chinaup(7000)  04-02|Selenium Powder 99.9%min Delivered Chinaup(5)  04-02|Tin Ingot 99.95%min EXW Chinaup(7000)  04-02|Silico-chrome Si 42%min, Cr 30%min EXW Chinaup(200)  04-02|Tin Solder Wire Sn 99.3%min, Cu 0.7%max EXW Chinaup(7)  04-02|Cobalt Intermediate 30-40% CIF Chinaup(0.2)  04-02|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinaup(7)  04-02|Tin Solder Bar Sn 40%min, Pb 59%max EXW Chinaup(3)  04-02
  • Mundra Aluminium to start building the first stage alumina project

    2024-04-12 10:06:10   [Print]
    BEIJING (Asian Metal) 12 Apr 24 - Mundra Aluminium Limited, a subsidiary of India Adani Group, plans to start building the first stage alumina project with the annual production capacity of 2.Asian Metal Copyright According to the source, the first stage project will consist of two low-temperature production lines and will depend on Indian domestic bauxite.Asian Metal Copyright4 million tonnes, a source from the company reports to Asian Metal.

    "Our first stage alumina project with the annual production capacity of 2.4 million tonnes would start building from late this year," says the source, adding that the construction might last for two years.Asian Metal Copyright8 billion.Asian Metal Copyright The total designed production capacity is 4 million tonnes per year with overall investment budget of around USD1.Asian Metal CopyrightBEIJING Asian Metal 12 Apr 24 - Mundra Aluminium Limited, a subsidiary of India Adani Group, plans to start building the first stage alumina project with the annual production capacity of 2.Asian Metal Copyright8 billion.

    According to the source, the first stage project will consist of two low-temperature production lines and will depend on Indian domestic bauxite. They now have two bauxite mining areas with total reserves of around 200 million tonnes and produce bauxite Al2O3 45%min SiO2 3%max.

    Present mainstream prices for alumina 98.5%min keep at USD370-380/t FOB India, unchanged from late last week.

    .Asian Metal Copyright5%min keep at USD370-380t FOB India, unchanged from late last weekAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.