• Lithium Carbonate 99.5%min Delivered Chinaup(3800)  08-13|Lithium Carbonate 99.2%min Delivered Chinaup(3400)  08-13|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(3000)  08-13|Spodumene Li2O 6%min CIF Chinaup(30)  08-13|Spodumene Li2O 3%min In port Chinaup(30)  08-13|Spodumene Li2O 5%min In port Chinaup(35)  08-13|Rhenium APR 99.99%min EXW Chinaup(300)  08-13|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-13|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-13|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-13|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurup(50)  08-13|Rebar BS4449 GR500 12mm In warehouse Kuala Lumpurup(50)  08-13|Silicon Metal 5-5-3 Delivered Europeup(30)  08-13|Germanium Dioxide 99.99%min Delivered USup(50)  08-13
  • Dongshan Aluminum updates on primary aluminum capacity replacement

    2025-08-12 15:10:48   [Print]
    Yidian Holding Group earlier announced plans to transfer primary aluminum production capacity of 240,000tpa from its Sanmenxia-based subsidiary Henan Hengkang Aluminum Co.Asian Metal Copyright The two sides have signed an internal transfer agreement and developed a capacity replacement plan, which has been released for public disclosure by the Department of Industry and Information Technology of Inner Mongolia.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright to Inner Mongolia Dongshan Aluminum Co.Asian Metal CopyrightYidian Holding Group earlier announced plans to transfer primary aluminum production capacity of 240,000tpa from its Sanmenxia-based subsidiary Henan Hengkang Aluminum Co.Asian Metal Copyright, Ltd.Asian Metal Copyright According to the plan, Dongshan Aluminum will build 150 units of 600KA electrolytic cells at the Chifeng High-tech Industrial Park, with an approved capacity of 240,000 tonnes per year.Asian Metal Copyright The two sides have signed an internal transfer agreement and developed a capacity replacement plan, which has been released for public disclosure by the Department of Industry and Information Technology of Inner Mongolia.

    According to the plan, Dongshan Aluminum will build 150 units of 600KA electrolytic cells at the Chifeng High-tech Industrial Park, with an approved capacity of 240,000 tonnes per year. Construction already started in August 2025, and production is expected by May 2026.Asian Metal Copyright So far, the company has completed capacity swap of 200,000tpa.Asian Metal Copyright So far, the company has completed capacity swap of 200,000tpa.

    .Asian Metal Copyright Asian Metal Copyright
    Aluminum Ingot 99.7%min In warehouse Wuxi
    Unit:RMB/mt
    Aluminum Ingot 99.7%min In warehouse Wuxi RMB/mt
    China primary aluminum producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.